Shandong Nora Industry and Trade

Shandong Nora Industry and Trade is a professional high-tech enterprise,

which is dedicated to the R&D, manufacturing, selling, leasing and consulting of formworks for road & bridge construction equipment.

The company is locating in Binzhou City of Shandong Province China.

The main products covers:
• Precast Segmental Box Girder Formwork
• Hydraulic Box Girder Formwork
• Cantilever Form Traveler
• U-Beam Formwork T-Beam Formwork
• Pier Formwork
• Tunnel Lining Trolley
• MSS and Launching Gantry


Mission : Let Chinese technologies benefit the world.

Vision : Creating value through technology and creating brilliance through services.

Core values: Equal emphasis on products and services, integration of knowledge and action.

More

Products

Products overview

Successful Cases

Successful cases overview

Teheran expressway project
Teheran expressway project

The Teheran expressway project has begun its construction in the early a few decades ago. The project was forced to stop because of The Iran-Iraq War.

Tianjin Binhai Avenue Project
Tianjin Binhai Avenue Project

Tianjin Binhai Avenue from Jingang Road to Jinqi Road.
With the total length of 3.61km, width 22m, two-way six lanes, two side sidewalk width 4m.

Syr Darya Bridge in Tajikistan
Syr Darya Bridge in Tajikistan

The bridge Located in the urban area of Khudzhand City, the second largest city of the Republic of Tajikistan

Qingdao Urban Rail Transit Project
Qingdao Urban Rail Transit Project

According to the published plans, ultimately there will be 16 lines in total with a combined length of 836 km.

Pakistan Dhan Gali Bridge Project
Pakistan Dhan Gali Bridge Project

It’s a 85m+170m+85m pre-stressed, post-tensioned continuous concrete rigid frame bridge with a total length of 340 meters pier height 36.85m. 

 Laos Pakbeng The Mekong River Bridge Project
Laos Pakbeng The Mekong River Bridge Project

The total length of the bridge is 700m, road length is 321m, can pass vessel displacement 300tons under the bridge. 

Tajikistan Tunnel Project
Tajikistan Tunnel Project

The total length of tunnel is 5286m, altitude of nearly 3000 meters, the geological situation is very complicated.

Cooperation

Win-win cooperation

Shandong Nora Industry and Trade