Successful cases overview
The total length of the bridge is 700m, road length is 321m, can pass vessel displacement 300tons under the bridge.
The construction period is 3 years. After the project finished, It will greatly enhance the development of regional trade, traffic, transport and logistics. Meanwhile, it as a part of Asia Highway Network, it will play an important role in prompting Laos, China and Thai’s trade and logistic. So the bridge was named “Laos China Friendship Bridge” By Laos.